{"id":6425,"date":"2017-09-06T17:09:39","date_gmt":"2017-09-06T17:09:39","guid":{"rendered":"https:\/\/lyceemolieresaragosse.org\/?p=6425"},"modified":"2017-09-06T17:09:39","modified_gmt":"2017-09-06T17:09:39","slug":"obras-de-mejora-en-las-instalaciones","status":"publish","type":"post","link":"https:\/\/lyceemolieresaragosse.org\/en\/obras-de-mejora-en-las-instalaciones\/","title":{"rendered":"Obras de mejora en las instalaciones"},"content":{"rendered":"<p><span lang=\"FR\">Pendant les vacances,\u00a0<\/span>quelques travaux d&#8217;am\u00e9nagement\u00a0ont \u00e9t\u00e9 r\u00e9alis\u00e9s\u200b\u00a0dans le Lyc\u00e9e, agrandissement d<span lang=\"FR\">e la classe des 2 ans\u00a0<\/span>avec\u200b\u00a0<span lang=\"FR\">installation de climatisation, cr\u00e9ation d&#8217;un bureau pour la coordination d<\/span>u Primaire\u200b<span lang=\"FR\">, et\u00a0 l&#8217;achat d&#8217;une deuxi\u00e8me\u00a0 photocopieuse pour la salle des professeurs.<\/span><\/p>\n<p class=\"m_4007988686224885722Corps\"><span lang=\"ES-TRAD\">Durante el verano se han llevado a cabo algunas obras de mejora de las instalaciones del colegio, como la ampliaci<\/span>\u00f3<span lang=\"ES-TRAD\">n del aula de 2 a\u00f1os y la instalaci<\/span>\u00f3<span lang=\"ES-TRAD\">n de aire acondicionado en esta sala, creaci<\/span>\u00f3<span lang=\"ES-TRAD\">n de un espacio para la coordinaci<\/span>\u00f3<span lang=\"ES-TRAD\">n de Primaria, y la compra de una nueva fotocopiadora para la sala de profesores.<\/span><u><\/u><u><\/u><\/p>\n\n<div uk-grid class=\"uk-child-width-1-3\">\n\n    \n<\/div>","protected":false},"excerpt":{"rendered":"<p>Pendant les vacances,\u00a0quelques travaux d&#8217;am\u00e9nagement\u00a0ont \u00e9t\u00e9 r\u00e9alis\u00e9s\u200b\u00a0dans le Lyc\u00e9e, agrandissement de la classe des 2 ans\u00a0avec\u200b\u00a0installation de climatisation, cr\u00e9ation d&#8217;un bureau pour la coordination du Primaire\u200b, et\u00a0 l&#8217;achat d&#8217;une deuxi\u00e8me\u00a0 photocopieuse pour la salle des professeurs. Durante el verano se han llevado a cabo algunas obras de mejora de las instalaciones del colegio, como la [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":2506,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"gallery","meta":{"_acf_changed":false,"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[9],"tags":[],"class_list":["post-6425","post","type-post","status-publish","format-gallery","has-post-thumbnail","hentry","category-varios","post_format-post-format-gallery"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/lyceemolieresaragosse.org\/en\/wp-json\/wp\/v2\/posts\/6425","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lyceemolieresaragosse.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lyceemolieresaragosse.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lyceemolieresaragosse.org\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lyceemolieresaragosse.org\/en\/wp-json\/wp\/v2\/comments?post=6425"}],"version-history":[{"count":0,"href":"https:\/\/lyceemolieresaragosse.org\/en\/wp-json\/wp\/v2\/posts\/6425\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lyceemolieresaragosse.org\/en\/wp-json\/wp\/v2\/media\/2506"}],"wp:attachment":[{"href":"https:\/\/lyceemolieresaragosse.org\/en\/wp-json\/wp\/v2\/media?parent=6425"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lyceemolieresaragosse.org\/en\/wp-json\/wp\/v2\/categories?post=6425"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lyceemolieresaragosse.org\/en\/wp-json\/wp\/v2\/tags?post=6425"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}